Published: 20-11-2026 09:18 | Updated: 20-11-2026 14:40

Planned power outage test in the Wargentin building – Tuesday, 1 Dec

Following the major power outage last autumn, Akademiska Hus will conduct a planned test of the building’s backup power and other critical systems on Tuesday, 1 December.

Power will be switched off at 08:00 and is expected to be restored by 08:30.

During the test, the regular power supply in the building will be unavailable. Electrical distribution boards, wall sockets and other equipment connected to regular power will therefore be without electricity.

Outlets and electrical distribution boards with white labels and designations beginning with A1XX or B1XX (for example A1DA:1 or B1AB:1) will be without power throughout the test.

Equipment connected to priority power, identified by red labels and designations beginning with A1R or B1R, will be supplied by backup power, which is expected to start within approximately 20 seconds. This includes servers, storage systems and other critical IT infrastructure located in the server room that are connected to backup power and are expected to remain operational throughout the test. 

What do I need to do?  

Desktop computers and other office equipment connected to standard wall sockets are likely to lose power when the test begins. Any devices that power off during the test may need to be switched on again manually once normal power has been restored.

Please save your work and switch off any sensitive electrical equipment, if necessary, before 08:00.

What about the doors?

Card readers and door readers will continue to operate, as they are connected to an uninterruptible power supply (UPS).

Contact persons

There will be personnel monitoring the work on site. If you have questions or are in need for a contact person before or during the outage please contact: