Published: 14-01-2025 14:16 | Updated: 15-01-2025 09:59

Work on the pressurized air system on floor 6 in Neo - 20 January

On the morning of Monday 20 January, there will be work done on the pressurized air system in the southern part of floor 6 (63xx-labs, 65xx-labs and 66xx-labs).

During the work, pressurized air in that part of Neo will be shut down briefly, but other parts of Neo will not be affected.