Published: 31-07-2024 11:12 | Updated: 02-08-2024 11:07

POSTPONED! - Planned power failure in Neo 15 August 2024

On 15 August a maintenance test of the power will require brief (5-15 minutes) sequential shutdowns of all power in each section of Neo.

The power shutdown will be performed on ALL power outlets in Neo, including back-up power.

A cursory check of some equipment, such as low temperature freezers, will be done by the Neo service team in conjunction with the shutdown, but all research groups are recommended to afterwards check all their critical equipment such as incubators and freezers.

Contact